Broadway US-36 Eastbound and Multimodal Improvements

The project will build a multimodal pathway, along the southern edge of Broadway, connecting CO-7/5th Ave in Lyons on the western end of downtown Lyons to the St Vrain trail network and Black Bear Hole at the eastern edge of town. Access to businesses will also be improved by creating pedestrian walkways and additional parking opportunities.

Currently, Broadway (US-36 eastbound) does not have sidewalks or bike lanes. This project will enhance pedestrian activity and enable pedestrians and cyclists to travel more safely along the roadway. It will also create pedestrian access on the northern edge to the businesses along Broadway, activating the north side of the road for improved business access, and add on-street parking along the southern and northern edges of Broadway (very similar to Main St parking and improvements).

View the project overview flyer.

View the project area map.

BROADWAY

Proposed Improvement- Broadway (Conceptual Draft January 2023)
Proposed Concept and Rendering - Broadway
Proposed Concept and Rendering - 4th Ave and Broadway

RAILROAD AVE.

Approved Proposed Improvements - Railroad Avenue (Option 5 Approved by Board of Trustees at April 17, 2023 meeting)
Proposed Concept and Rendering - Railroad Ave

Previous Proposed Improvements - Railroad Avenue (Conceptual Draft January 2023)

TIMELINE:

January 2022 - The design phase of the project began.
Summer 2023 - Mountain Constructors was awarded the construction contract.
August 2023 - Construction starts.
Spring 2024 - Project completion is anticipated to be final by spring. 

Weekly Construction Updates

For the week of  November 6, 2023 Crews will work on the following: 

  Work continuing on boulder retaining wall on the South side of Broadway between 4th and 5th Avenue 
  Preparation and installation of the new sidewalk and curb and gutter on the south side of Broadway

Reminder: This is an active construction site.  To ensure the safety of crews and traveling public it is important to stay out of all work areas and use alternate routes.  Do not remove any fencing or traffic control devices within the work zone.  Authorities will be contacted if any tampering is observed.


Major project elements include:

1. Narrower travel lanes to enhance safety for all modes of travel
2. Curb extensions to shorten crossing distances at intersections
3. New sidewalks along the north side of the roadway
4. Addition of public parking spaces along both the northern and southern edges
5. Delivery and service access to businesses along the north side of Broadway
6. Improved bicycle and pedestrian access to downtown, the Library, Sandstone Park, and Black Bear Hole
7. Multimodal pathway (bike/ped) along the south side of Broadway

In 2021, this project secured additional funding through the Colorado Department of Transportation ‘s Revitalizing Main Street program. The bulk of the financing is from Transportation Improvement Projects Funding from DRCOG. The Town match is currently estimated to be approximately $61K.

View Previous Public Outreach Materials:

Previous Meetings and info:


Thursday, March 31, 2022 6 - 7 pm
Public Input Meeting via zoom
Presentation:
Public Meeting and Input Discussion 

Thursday, March 10, 2022 3  - 5 pm 
Meeting with businesses located on Broadway.
Location: Lyons Regional Library

Tuesday, March 8, 2022 12 - 2pm
Meeting with businesses located on Broadway.
Location: Lyons Regional Library

Wednesday, January 20, 2021 at 4:00 p.m. 

Meeting with businesses located on Broadway.
Location: Online via Zoom
Presentation: 
US36 Multimodal Improvement Presentation